Date set for Kettering Swimming Pool repairs as facility remains shut
Swimmers will be welcomed back to Kettering Swimming Pool following a closure for repairs this week.
The pool in London Road is currently closed due to a fault in the pool’s air handling system.
An issue with the air system’s motor led to a sustained drop in both air and water temperatures within the pool hall, rendering the Swimming Pool unsuitable for public use.
Once repaired, both water and air temperatures need to be brought back to the correct levels – there is no time frame for this process.


A spokesman for North Northamptonshire Council said: "Engineers have attended the site and confirmed that a replacement motor has now been sourced. “Repair works are scheduled to be completed on Thursday, November 13.
“Subject to successful installation and commissioning and thermal conditions within the pool hall returning to appropriate levels, the swimming pool will reopen as soon as practically possible.”
“We will continue to provide updates and confirm a reopening date as soon as we are able.
“Please note that the gym remains open and fully operational during this period.”
Members are able to use their membership to access facilities at Freedom Leisure Centres in Thrapston and Rushden.
