DISRUPTION: Warning for motorists ahead of roadworks across Northamptonshire

Advance warning of roadworks across Northamptonshire.
Road closuresRoad closures
Road closures

MAJOR ROADS:

DAVENTRY: Braunston Road opposite Bridleway entrance, 120m from Royal Oak Way 24 hour 2 way traffic signals for cable diversion works 22-Sep-15 02-Oct-15

DAVENTRY: Braunston Road, 336m from roundabout 2 way traffic signals for carrying out trial hole for access to main 21-Sep-15 21-Sep-15

Hide Ad
Hide Ad

GEDDINGTON, LITTLE OAKLEY AND STANION: Stamford Road 2/3 way traffic signals as appropriate in operation 0915-1515 (Monday to Friday only) for carriageway drainage works 21-Sep-15 12-Oct-15

RUSHDEN: Higham Road jnc with Prospect Avenue 3 way traffic signals in operation overnight from 2000-0600 for repairs to leaking pipe 23-Sep-15 25-Sep-15

RUSHDEN: High Street South - o/s 118 24 hour 2 way traffic signals for new electric supply 26-Oct-15 02-Nov-15

WOLLASTON:

Wellingborough Road adjacent to 24 Roses Close 24 hour 2 way traffic signals for gas connection works 02-Nov-15 05-Nov-15

Hide Ad
Hide Ad

WELLINGBOROUGH: London Road near Pizza Hut 24 hour 4 way traffic signals in use Monday to Friday for construction of new junction and splitter islands for traffic signals 6-Jul-15 30-Oct-15

OTHER ROADS:

ABTHORPE: Towcester Road at junction of Main Road, 2 way traffic signals in operation during off peak hours for communication pipe repair, 11-Sep-15 15-Sep-15

AYNHO: Croughton Road, from junction of The Square to junction of Station Road, 24 hour 2 way traffic signals for installation of fibre optic cable, 01-Sep-15 to 08-Oct-15

BRACKLEY: Radstone Road at junction of Ellesmere Road, 24 hour 3 way traffic signals for foul sewer connection for new development, 01-Sep-15 to 15-Sep-15

Hide Ad
Hide Ad

BRACKLEY: Burwell Hill outside number 37 to junction of Radstone Road, 2 way traffic signals in operation during the working day for installation of new supply 13-Nov-15 to 14-Dec-15

CREATON: Hollowell Road, along whole length, 24 hour 2 way traffic signals for installation of fibre optic cable, 05-Oct-15 to 16-Oct-15

CROUGHTON: Blenheim from junction of Mill Lane to number 19, 2 way traffic signals in operation during the working day for installation of fibre optic cable, 23-Sep-15 to 06-Oct-15

EASTON ON THE HILL: High Street, outside number 42, 24 hour 2 way traffic signals for installation of gas to property, 26-Oct-15 to 29-Oct-15

Hide Ad
Hide Ad

EVERDON: Stubbs Road, at junction of Wells Road, Multi way traffic signals in operation during the working day for repairs to fire hydrant, 23-Sep-15 to 25-Sep-15

GUILSBOROUGH: High Street, along length, 24 hour 2 way traffic signals for installation of fibre optic cable, 05-Oct-15 to 16-Oct-15

GUILSBOROUGH: Hollowell Road, 350m south of jnc with Coton Road, 24 hour 2 way traffic signals for installation of fibre optic cable, 28-Sep-15 to 09-Oct-15

HACKLETON: Main Rd jnc with Preston Deanery Road and Houghton Road, 4 way traffic signals in operation 0930-1530 for access to underground boxes 17-Sep-15 to 18-Sep-15

Hide Ad
Hide Ad

HARTWELL: Forest Road, close to the M1 bridge, 24 hour 2 way traffic signals in operation as and when required for creation of bellmouth to industrial estate, 21-Jul-15 to 29-Sep-15

HELMDON: Wappenham Road between number 62 and number 15, 24 hour 2 way traffic signals for cabling works, 19-Aug-15 to 21-Oct-15

HOLCOT: Moulton Road, outside Hospital Bungalows, 2 way traffic signals in operation 0830-1630 for installation of vehicle access, 23-Sep-15 to 24-Sep-15

HOLLOWELL: Creaton Road, along whole length, 24 hour 2 way traffic signals for installation of fibre optic cable, 12-Oct-15 to 30-Oct-15

Hide Ad
Hide Ad

HOLLOWELL: Guilsborough Road, along whole length, 24 hour 2 way traffic signals for installation of fibre optic cable, 17-Sep-15 to 02-Oct-15

IRCHESTER: Arkwright Road at junction of Station Road, 3 way traffic signals in operation during the working day for tree trimming works, 17-Sep-15 to 18-Sep-15

IRCHESTER: Gipsy Lane, outside numbers 30 and 50, 2 way traffic signals in operation during the working day for tree trimming works, 18-Sep-15 to 21-Sep-15

IRCHESTER: Station Road, outside Station House to 60m east from outside Ford Cottage, 2 way traffic signals in operation during the working day for tree trimming works, 9/21/2015 to 9/22/2015

Hide Ad
Hide Ad

IRTHLINGBOROUGH: Victoria Street at junction of Windmill Road, 24 hour multi way traffic signals for disconnection works, 07-Sep-15 to 16-Sep-15

KELMARSH: Harborough Road at junciton of Haselbech Road, 3 way traffic signals in operation 0930-1530 for widening of north corner of Haselbech Road at junction, 16-Sep-15 to 18-Sep-15

KINGS SUTTON: Banbury Lane at junction of Sandringham Road, 24 hour 3 way traffic signals for installation of new supply, 10-Oct-15 to 02-Nov-15

LAMPORT: Rothwell Road - 1 mile north of Village, 2 way traffic signals in operation during off peak hours to repair a leak, 18-Sep-15 to 22-Sep-15

Hide Ad
Hide Ad

LONG BUCKBY: Station Road near M1 bridge outside Wharf Industrial Estate, 2 way traffic signals in operation during off peak hours for remedial works, 28-Aug-15 to 09-Oct-15

LONG BUCKBY: Murcott, opposite Murcott House, 2 way traffic signals in operation during off peak hours for remedial works, 28-Aug-15 to 09-Oct-15

LONG BUCKBY: Station Road near number 96, 24 hour 2 way traffic signals for installation of new supply , 16-Sep-15 to 18-Sep-15

MAIDWELL / LAMPORT: A508 Harborough Road from junciton of High St to junction of Draughton Road, 2 way traffic signals in operation during the working day for fibre connection works, 14-Sep-15 to 25-Sep-15

Hide Ad
Hide Ad

MEARS ASHBY: Wellingborough Road, near number 27, 24 hour 2 way traffic signals for gas connection works, 26-Oct-15 to 29-Oct-15

NORTHAMPTON: Hazeldene Road at junction of Kenmuir Avenue, 24 hour 3 way traffic signals for gas mains replacement, 21-Sep-15 to 19-Oct-15

NORTHAMPTON: Brookfield Road, 24 hour 2 way traffic signals for new connection works, 05-Oct-15 to 13-Oct-15

PAULERSPURY: Careys Road - o/s Highfields Stables, 2 way traffic signals in operation during off peak hours to repair a leak, 15-Sep-15 to 17-Sep-15

Hide Ad
Hide Ad

RADSTONE/BRACKLEY: Brackley Road, Radstone/Radstone Road, Brackley, near new roundabout, 24 hour 2 way traffic signals for cabling works, 30-Nov-15 to 14-Dec-15

RAUNDS: London Road/Chelveston Road from side of number 84 to Red Lion PH, 24 hour 2 way traffic signals for mainlaying works, 05-Aug-15 to 15-Sep-15

RAUNDS: Brick Kiln Road - approx 75m east of jnc with Enterprise Road, 2 way traffic signals in operation during off peak hours for access to underground chambers 02-Nov-15 to 04-Nov-15

ROADE: Hartwell Road/The Green, 24 hour 3 way traffic signals for connection of water main, 21-Sep-15 to 25-Sep-15

Hide Ad
Hide Ad

SILVERSTONE: West End near West End Farm, 2 way traffic signals in operation during off peak hours for stop tap repair, 17-Sep-15 to 21-Sep-15

SYWELL: Overstone Road at junction of Holcot Lane, 3 way traffic signals in operation during off peak hours for manhole repairs, 17-Sep-15 to 18-Sep-15